Station · estuary

Nethermill Reach

Floods in four hours and takes eight to go. Do not plan a passage on the mean.

48 hours · height in metres above chart datum · all eight constituents

Mean spring range
6.28 m
Mean neap range
3.12 m
MHWS
7.69 m
MLWS
1.41 m
Form factor
0.06
Classification
semidiurnal

Estuary station. The flood is shorter than the ebb, which is M4 doing the same job in a different phase.

Nine miles inside the mouth, soft mud, drying banks either side of the channel.

M4 is 17.9% of M2 here. Above about a quarter, and in the right phase, that is enough to flatten the crest of the tide into two — over one spring–neap cycle of 14.765 days this station carries a second high water on twelve of its twenty-nine tides. The two days drawn above are deliberately at springs, which is when it is clearest — a page that quietly picked its best two days without saying so would be a brochure. In them there are 4 high waters .

The constituent table

Amplitude and phase lag at Nethermill Reach. The periods are astronomy and are the same everywhere; the two right-hand columns are the whole of what a tidal analysis produces.
IdConstituentPeriod, hAmplitude, mPhase g
M2 Principal lunar semidiurnal 12.4206012 2.35 12°
S2 Principal solar semidiurnal 12.0000000 0.79 58°
N2 Larger lunar elliptic semidiurnal 12.6583475 0.45 354°
K2 Lunisolar semidiurnal 11.9672348 0.22 56°
K1 Lunisolar diurnal 23.9344697 0.10 168°
O1 Principal lunar diurnal 25.8193417 0.08 30°
P1 Principal solar diurnal 24.0658902 0.03 164°
M4 Shallow water overtide of M2 6.2103006 0.42 96°

High and low water, 48 hours

Turning points of the curve above, read off the same series that draws it.
TimeEventHeight, m
day 1 01:03 High water 8.36
day 1 06:27 Low water 1.18
day 1 13:21 High water 8.54
day 1 18:49 Low water 0.85
day 2 01:45 High water 8.53
day 2 07:08 Low water 0.97
day 2 14:03 High water 8.61
day 2 19:30 Low water 0.65

Survey sheet NR/2

265 soundings on run lines 46 units apart, 37 of them drying heights, deepest 12.1 m. One stroke on the sheet — the coastline — and no depth contours. Why.

Survey sheet NR/2, Nethermill Reach: 265 soundings in metres and one coastline, with no depth contours.

Get Wrackline

Wrackline is an aid to planning and is not a substitute for an official tide table. Do not navigate on it.